ITAC Assessment: UD0603
ITAC logo
ITAC Assessment: UD0603
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product mechanical drive system components and garden equipment
NAICS
n/a
SIC 3524: Lawn and Garden Tractors and Home Lawn and Garden Equipment
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 100,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,039 1,588,218
kWh
Electricity Demand $21,980 6,912
kW-mo/yr
LPG $24,892 3,533
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,490

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 3.5112: Reprocess spent oils on site for re-use $32,490 $3,200 - - - $32,490
-
gal
- -
02 3.2171: Use an automatic plate processor $18,720 $25,000 - - - - - $18,720
03 2.7212: Install or upgrade insulation on hvac distribution systems $4,692 $15,500 - - $4,692
-
MMBtu
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,594 $15,288 $3,790
126,319
kWh
$804
-
kW-mo/yr
- - - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $2,250 $3,000 - - - - $2,250
-
lb
-
TOTAL RECOMMENDED $62,746 $61,988 $3,790
126,319
kWh
$804
-
kW-mo/yr
$4,692
-
MMBtu
$32,490
-
gal
$2,250
-
lb
$18,720
TOTAL IMPLEMENTED $32,490 $3,200 - - - $32,490
-
gal
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs