ITAC Assessment: UD0598
ITAC logo
ITAC Assessment: UD0598
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Custom bar soap products
NAICS
n/a
SIC 2841: Soap and Other Detergents, Except Specialty Cleaners
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 250,000
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 6,732
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,274 3,332,063
kWh
Electricity Demand $170,474 12,168
kW-mo/yr
Natural Gas $167,223 50,442
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,279,544 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,854

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.441: Install automatic packing equipment $1,210,579 $375,000 $(-240.0)
(-11,430)
kWh
$(-941.0)
-
kW-mo/yr
- - - $1,211,760 -
02 3.4111: Use closed cycle process to minimize waste water production $22,073 $34,288 $(-3,084.0)
(-146,835)
kWh
$(-6,052.0)
-
kW-mo/yr
- $31,209
-
Tgal
- - -
03 2.2121: Increase amount of condensate returned $15,756 $18,000 - - $9,173
-
MMBtu
$4,179
-
Tgal
$2,404
-
lb
- -
04 3.8314: Purchase high materials in returnable bulk containers $13,603 - - - - - $(-3,227.0)
-
lb
$16,830 -
05 2.8118: Check for accuracy of utility / power meters $9,640 - - - - - - - $9,640
06 2.2163: Use minimum steam operating pressure $3,333 - - - $3,333
-
MMBtu
- - - -
07 2.7135: Install occupancy sensors $1,752 $726 $356
16,999
kWh
$1,396
-
kW-mo/yr
- - - - -
08 3.4114: Replace city water with recycled water via cooling tower $1,720 $500 - - - $1,720
-
Tgal
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,088 $4,253 $397
18,757
kWh
$691
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $1,279,544 $432,767 $(-2,571.0)
(-122,509)
kWh
$(-4,906.0)
-
kW-mo/yr
$12,506
-
MMBtu
$37,108
-
Tgal
$(-823.0)
-
lb
$1,228,590 $9,640
TOTAL IMPLEMENTED $37,854 $39,041 $(-2,687.0)
(-128,078)
kWh
$(-5,361.0)
-
kW-mo/yr
$3,333
-
MMBtu
$32,929
-
Tgal
- - $9,640
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs