Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Ultrasonic machining of silicon
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 70,000
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,952 2,751,172
kWh
Electricity Demand $91,511 6,504
kW-mo/yr
Natural Gas $4,952 863
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,260 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,705

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
01 4.631: Install an uninteruptable power supply $52,000 $172,190 - - - - $(-8,000.0) $60,000
02 2.8114: Change rate schedules or other changes in utility service $8,705 - $8,705 - - - - -
03 3.3111: Adjust ph for neutralization $7,560 $30,000 - - $7,560
-
gal
- - -
04 2.2437: Recover waste heat from equipment $4,045 $3,000 - $4,045
-
MMBtu
- - - -
05 3.5217: Reuse / recycle/ sell paper products $1,950 - - - - $1,950
-
lb
- -
TOTAL RECOMMENDED $74,260 $205,190 $8,705 $4,045
-
MMBtu
$7,560
-
gal
$1,950
-
lb
$(-8,000.0) $60,000
TOTAL IMPLEMENTED $8,705 - $8,705 - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs