ITAC Assessment: UD0587
ITAC logo
ITAC Assessment: UD0587
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product commercial printed products
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 51
Plant Area 70,000
ft2
Annual Production 7
Tgal
Production Hrs. Annual 6,864
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,325 1,117,819
kWh
Electricity Demand $41,647 2,960
kW-mo/yr
Natural Gas $9,280 1,413
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $983,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $407,698

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
01 4.453: Reschedule breaks to allow for continuous production $374,400 - - - $374,400 - -
02 4.112: Replace old machine with new automatic multi-station tool $365,350 $1,000,000 - - $43,600 - $321,750
03 4.431: Train operators for maximum operating efficiency $195,104 $6,720 - - $195,104 - -
04 4.112: Replace old machine with new automatic multi-station tool $32,550 - - - - $32,550 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $15,175 $39,298 $7,304
347,890
kWh
$7,871
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $748 $360 $479
17,878
kWh
$269
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $983,327 $1,046,378 $7,783
365,768
kWh
$8,140
-
kW-mo/yr
$613,104 $32,550 $321,750
TOTAL IMPLEMENTED $407,698 $360 $479
17,878
kWh
$269
-
kW-mo/yr
$374,400 $32,550 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs