ITAC Assessment: UD0572
ITAC logo
ITAC Assessment: UD0572
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Bottled soft drinks
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 140,000
ft2
Annual Production 12,800,000
pieces
Production Hrs. Annual 6,912
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,629 5,641,852
kWh
Electricity Demand $136,587 12,372
kW-mo/yr
Natural Gas $53,050 16,111
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,025,203 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,417

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 4.515: Install shelves / racks to utilize unused space $948,600 $580,553 - - - - $129,600 $819,000
02 3.1163: Use plastic pallets instead of wood $38,960 $110,457 - - - - $38,960 -
03 3.3128: Utilize other methods to remove contaminants $28,186 $41,000 $(-737.0)
(-36,928)
kWh
$(-706.0)
-
kW-mo/yr
$31,629
-
Tgal
$(-2,000.0) - -
04 2.7144: Install spectral reflectors / delamp $9,457 $(-27,115.0) $4,159
208,089
kWh
$5,298
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $1,025,203 $704,895 $3,422
171,161
kWh
$4,592
-
kW-mo/yr
$31,629
-
Tgal
$(-2,000.0) $168,560 $819,000
TOTAL IMPLEMENTED $48,417 $83,342 $4,159
208,089
kWh
$5,298
-
kW-mo/yr
- - $38,960 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs