ITAC Assessment: UD0369
ITAC logo
ITAC Assessment: UD0369
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product THERMAL SPRAY COATING
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area
n/a
Annual Production 99,000
pieces
Production Hrs. Annual 7,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,543 2,417,644
kWh
Natural Gas $63,684 14,381
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,822 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,629

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $612 $1,600 $612
-
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,020 - $7,020
-
kWh
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,504 - $9,504
-
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $850 - $850
21,688
kWh
-
05 2.2437: Recover waste heat from equipment $6,413 $300 - $6,413
-
MMBtu
06 2.4322: Use or replace with energy efficient substitutes $15,581 $25,000 $11,868
301,290
kWh
$3,713
-
MMBtu
07 2.6212: Turn off equipment during breaks, reduce operating time $5,842 $1,800 - $5,842
-
MMBtu
TOTAL RECOMMENDED $45,822 $28,700 $29,854
322,978
kWh
$15,968
-
MMBtu
TOTAL IMPLEMENTED $29,629 $2,100 $17,374
21,688
kWh
$12,255
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs