Assessment Year | 1992 |
---|---|
Principal Product | THERMAL SPRAY COATING |
NAICS |
n/a
|
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 99,000
pieces
|
Production Hrs. Annual | 7,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $143,543 | 2,417,644 |
kWh
|
$0.059 |
Natural Gas | $63,684 | 14,381 |
MMBtu
|
$4.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,822 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,629 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $612 | $1,600 |
$612
-
kWh
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,020 | - |
$7,020
-
kWh
|
- | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $9,504 | - |
$9,504
-
kWh
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $850 | - |
$850
21,688
kWh
|
- | |
05 | 2.2437: Recover waste heat from equipment | $6,413 | $300 | - |
$6,413
-
MMBtu
|
|
06 | 2.4322: Use or replace with energy efficient substitutes | $15,581 | $25,000 |
$11,868
301,290
kWh
|
$3,713
-
MMBtu
|
|
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,842 | $1,800 | - |
$5,842
-
MMBtu
|
|
TOTAL RECOMMENDED | $45,822 | $28,700 |
$29,854
322,978
kWh
|
$15,968
-
MMBtu
|
||
TOTAL IMPLEMENTED | $29,629 | $2,100 |
$17,374
21,688
kWh
|
$12,255
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs