Assessment Year | 1999 |
---|---|
Principal Product | electronic measuring equipment and sensors |
NAICS |
n/a
|
SIC | 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products |
Sales Range | $10 M to 50M |
# of Employees | 230 |
Plant Area |
110,000
ft2
|
Annual Production | 31,250
pieces
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $109,304 | 3,440,211 |
kWh
|
$0.032 |
Electricity Demand | $53,664 | 8,256 |
kW-mo/yr
|
$6.50 |
Natural Gas | $8,312 | 1,635 |
MMBtu
|
$5.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,193 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,171 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.8132: Use less toxic and volatile solvent substitutes | $8,393 | $3,600 | - | - | - |
$3,393
-
gal
|
- | - | - | $5,000 | |
02 | 3.5217: Reuse / recycle/ sell paper products | $5,475 | $7,000 | - | - | - | - |
$3,375
-
lb
|
$(-1,500.0) | $3,600 | - | |
03 | 2.7242: Change zone reheat coils to variable air volume boxes | $5,171 | $4,000 |
$906
28,429
kWh
|
- |
$4,265
-
MMBtu
|
- | - | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,154 | $2,000 |
$1,814
56,565
kWh
|
$1,340
-
kW-mo/yr
|
- | - | - | - | - | - | |
TOTAL RECOMMENDED | $22,193 | $16,600 |
$2,720
84,994
kWh
|
$1,340
-
kW-mo/yr
|
$4,265
-
MMBtu
|
$3,393
-
gal
|
$3,375
-
lb
|
$(-1,500.0) | $3,600 | $5,000 | ||
TOTAL IMPLEMENTED | $5,171 | $4,000 |
$906
28,429
kWh
|
- |
$4,265
-
MMBtu
|
- | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs