ITAC Assessment: UD0566
ITAC logo
ITAC Assessment: UD0566
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product reinforced rubber hose
NAICS
n/a
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 250,000
ft2
Annual Production 12,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $432,757 23,342,028
kWh
Electricity Demand $699,969 49,608
kW-mo/yr
Natural Gas $93,885 21,690
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $270,112 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,578

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings By-product Production Savings
01 3.5218: Reuse / recycle/ sell rubber products $110,878 $86,000 $(-566.0)
(-26,964)
kWh
$(-5,486.0)
-
kW-mo/yr
- $44,730
-
lb
- - - $72,200
02 3.4111: Use closed cycle process to minimize waste water production $59,980 $6,380 - - $59,980
-
Tgal
- - - - -
03 2.3134: Shift from daytime to nighttime operation $53,332 - - $60,820
-
kW-mo/yr
- - $(-7,488.0) - - -
04 4.322: Eliminate old stock and modify inventory control $19,000 - - - - - - - $19,000 -
05 2.4239: Eliminate or reduce compressed air usage $14,598 $15,000 $6,369
303,341
kWh
$8,229
-
kW-mo/yr
- - - - - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $10,800 - - - - - - $10,800 - -
07 2.3132: Recharge batteries on during off-peak demand periods $1,524 - - $1,524
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $270,112 $107,380 $5,803
276,377
kWh
$65,087
-
kW-mo/yr
$59,980
-
Tgal
$44,730
-
lb
$(-7,488.0) $10,800 $19,000 $72,200
TOTAL IMPLEMENTED $74,578 $21,380 $6,369
303,341
kWh
$8,229
-
kW-mo/yr
$59,980
-
Tgal
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs