ITAC Assessment: UD0564
ITAC logo
ITAC Assessment: UD0564
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product aluminum die castings
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 45,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 7,344
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,165 2,721,278
kWh
Electricity Demand $91,602 6,492
kW-mo/yr
Natural Gas $236,181 70,307
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $301,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,275

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $220,632 $300,000 - - - - $205,632 $15,000
02 2.4226: Use / purchase optimum sized compressor $22,972 $148 $10,950
527,257
kWh
$12,022
-
kW-mo/yr
- - - -
03 2.2414: Use waste heat from hot flue gases to preheat $22,776 $49,660 - - $22,776
-
MMBtu
- - -
04 2.2514: Cover open tanks $13,847 $2,400 - - $13,847
-
MMBtu
- - -
05 2.3134: Shift from daytime to nighttime operation $10,689 - - $10,689
-
kW-mo/yr
- - - -
06 3.4155: Meter waste water $5,686 $2,200 - - - $5,686
-
gal
- -
07 3.4156: Use flow control valves on equipment to optimize water use $2,767 $3,375 $478
22,860
kWh
$525
-
kW-mo/yr
- - $1,764 -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,156 $5,096 $1,104
52,462
kWh
$1,212
-
kW-mo/yr
- - $(-160.0) -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $218 $684 $56
2,638
kWh
$91
-
kW-mo/yr
- - - $71
TOTAL RECOMMENDED $301,743 $363,563 $12,588
605,217
kWh
$24,539
-
kW-mo/yr
$36,623
-
MMBtu
$5,686
-
gal
$207,236 $15,071
TOTAL IMPLEMENTED $50,275 $5,923 $11,428
550,117
kWh
$23,236
-
kW-mo/yr
$13,847
-
MMBtu
- $1,764 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs