ITAC Assessment: UD0562
ITAC logo
ITAC Assessment: UD0562
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Metal castings for electric motors
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $500
k
to 1
M
# of Employees 125
Plant Area 48,600
ft2
Annual Production 204,000
lb
Production Hrs. Annual 3,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,978 1,549,824
kWh
Electricity Demand $56,393 334
kW-mo/yr
Natural Gas $6,573 1,333
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,475 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,807

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,767 $10,000 $4,805
218,347
kWh
$9,962
-
kW-mo/yr
- - - -
02 2.3137: Use power during off-peak periods $10,130 - - $10,130
-
kW-mo/yr
- - - -
03 4.652: Replace existing equipment with more suitable substitutes $4,200 $4,000 - - - - $4,200 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,677 $1,040 $1,945
88,511
kWh
$3,732
-
kW-mo/yr
- - - -
05 3.5111: Filter and reuse hydraulic oil $5,340 $4,000 - - - $2,984
-
gal
- $2,356
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,976 $13,500 $4,786
217,761
kWh
$9,286
-
kW-mo/yr
$(-9,096.0)
-
MMBtu
- - -
07 3.8143: Recycle cleaning solvent and reuse $2,344 $4,000 - - - $2,344
-
gal
- -
08 3.5112: Reprocess spent oils on site for re-use $2,041 $3,000 - - - $1,682
-
gal
- $359
TOTAL RECOMMENDED $49,475 $39,540 $11,536
524,619
kWh
$33,110
-
kW-mo/yr
$(-9,096.0)
-
MMBtu
$7,010
-
gal
$4,200 $2,715
TOTAL IMPLEMENTED $15,807 $1,040 $1,945
88,511
kWh
$13,862
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs