ITAC Assessment: GT0321
ITAC logo
ITAC Assessment: GT0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product ROLLED METAL SHAPES
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 17,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,956 2,403,869
kWh
Natural Gas $37,452 6,991
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,346 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,346

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,760 $250 $5,760
77,960
kWh
02 2.4237: Substitute compressed air cooling with water or air cooling $9,000 $1,900 $9,000
123,388
kWh
03 2.2122: Install / repair insulation on condensate lines $381 $325 $381
5,275
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,150 $2,500 $8,150
107,855
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,656 $4,160 $2,656
34,291
kWh
06 2.4133: Use most efficient type of electric motors $399 $793 $399
5,275
kWh
TOTAL RECOMMENDED $26,346 $9,928 $26,346
354,044
kWh
TOTAL IMPLEMENTED $17,346 $8,028 $17,346
230,656
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs