ITAC Assessment: KG0097
ITAC logo
ITAC Assessment: KG0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Party Ice.
NAICS
n/a
SIC 2097: Manufactured Ice
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 11,600
ft2
Annual Production 119,800,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,125 3,138,335
kWh
Electricity Demand $38,053 5,656
kW-mo/yr
Electricity Fees $1,560 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $727,959 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Primary Product Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,522 $5,150 n/a $1,522
49,238
kWh
- -
02 2.7496: Install partitions to reduce size of conditioned space $8,416 $8,894 n/a $8,416
271,395
kWh
- -
03 3.7221: Improve process control to prevent spills of material $90,970 $800 n/a - $90,970
-
Tgal
-
04 4.111: Add equipment/ operators to reduce production bottleneck $596,163 $8,894 n/a - - $596,163
05 4.513: Re-arrange equipment layout to reduce labor costs $30,888 $43,000 n/a - - $30,888
TOTAL RECOMMENDED $727,959 $66,738 $9,938
320,633
kWh
$90,970
-
Tgal
$627,051
TOTAL IMPLEMENTED - - - - -