| Assessment Year | 1998 |
|---|---|
| Principal Product | Wire ,cold drawn and hot rolled steel, spring, coiling and f |
| NAICS |
n/a
|
| SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
| Sales Range | $10 M to 50M |
| # of Employees | 210 |
| Plant Area |
197,650
ft2
|
| Annual Production | 3,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $359,477 | 8,623,681 |
kWh
|
$0.042 |
| Electricity Demand | $112,343 | 30,528 |
kW-mo/yr
|
$3.68 |
| Natural Gas | $274,316 | 67,355 |
MMBtu
|
$4.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $205,151 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $34,609 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.1191: Change procedures / equipment / operating conditions | $101,400 | $60,000 | - | - | - |
$101,400
-
lb
|
- | - | |
| 02 | 4.652: Replace existing equipment with more suitable substitutes | $47,736 | $2,000 | - | - | - | - | $47,736 | - | |
| 03 | 4.122: Develop standard procedures to improve internal yields | $28,560 | $8,000 | - | - | - | - | $28,560 | - | |
| 04 | 2.2511: Insulate bare equipment | $19,707 | $21,120 | - | - |
$19,707
-
MMBtu
|
- | - | - | |
| 05 | 2.2136: Install / repair insulation on steam lines | $4,026 | $1,850 | - | - |
$4,026
-
MMBtu
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,699 | $6,419 |
$1,242
32,239
kWh
|
$457
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.2514: Cover open tanks | $2,023 | $1,050 | - | - |
$686
-
MMBtu
|
- | - |
$1,337
-
Tgal
|
|
| TOTAL RECOMMENDED | $205,151 | $100,439 |
$1,242
32,239
kWh
|
$457
-
kW-mo/yr
|
$24,419
-
MMBtu
|
$101,400
-
lb
|
$76,296 |
$1,337
-
Tgal
|
||
| TOTAL IMPLEMENTED | $34,609 | $10,900 | - | - |
$4,712
-
MMBtu
|
- | $28,560 |
$1,337
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs