ITAC Assessment: UD0543
ITAC logo
ITAC Assessment: UD0543
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Quartz Manchining, Grinding, lapping, and polishing
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 48
Plant Area 25,000
ft2
Annual Production 350,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,421 712,192
kWh
Electricity Demand $24,988 1,776
kW-mo/yr
Natural Gas $7,994 1,631
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $338,554 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings By-product Production Savings
01 4.652: Replace existing equipment with more suitable substitutes $256,936 $100,000 - - - $256,936 - -
02 3.2135: Extend solution life with filtering or carbonate freezing $45,731 $4,000 - - - - $(-600.0) $46,331
03 3.2135: Extend solution life with filtering or carbonate freezing $21,625 $4,000 - - $13,230 - $(-600.0) $8,995
04 3.2135: Extend solution life with filtering or carbonate freezing $6,584 $10,000 - - $5,292 - $(-1,800.0) $3,092
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,018 $16,558 $2,352
90,563
kWh
$3,666
-
kW-mo/yr
- - - -
06 2.3137: Use power during off-peak periods $1,660 - - $1,660
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $338,554 $134,558 $2,352
90,563
kWh
$5,326
-
kW-mo/yr
$18,522 $256,936 $(-3,000.0) $58,418
TOTAL IMPLEMENTED $75,600 $18,000 - $1,660
-
kW-mo/yr
$18,522 - $(-3,000.0) $58,418
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs