ITAC Assessment: ND0032
ITAC logo
ITAC Assessment: ND0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PRECISION MACHINING
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,680
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,513 2,081,477
kWh
Natural Gas $33,741 8,010
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,603 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,603

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $906 $6,230 $906
13,775
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,574 $500 $4,574
69,754
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $123 $809 $239
3,517
kWh
$(-116.0)
TOTAL RECOMMENDED $5,603 $7,539 $5,719
87,046
kWh
$(-116.0)
TOTAL IMPLEMENTED $5,603 $7,539 $5,719
87,046
kWh
$(-116.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs