ITAC Assessment: UD0542
ITAC logo
ITAC Assessment: UD0542
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Steel forging, rough machining, and heat treating
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 250,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 4,590
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,548 3,558,031
kWh
Electricity Demand $140,475 9,984
kW-mo/yr
Natural Gas $589,484 157,984
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $241,945 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $207,656

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 4.122: Develop standard procedures to improve internal yields $183,600 - - - - - $183,600 -
02 3.5244: Recover metals from casting sand $21,000 $4,800 - - - - - $21,000
03 2.3137: Use power during off-peak periods $11,143 - - $11,143
-
kW-mo/yr
- - - -
04 3.5316: Contract a wood pallet recycling company $8,400 - - - - - $8,400 -
05 2.3512: De-energize excess transformer capacity $8,000 $17,000 - - $9,000 - $(-1,000.0) -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,513 $14,128 $1,540
70,047
kWh
$2,973
-
kW-mo/yr
- - - -
07 2.2414: Use waste heat from hot flue gases to preheat $4,236 $20,000 - - - $4,236
-
MMBtu
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,053 - $378
17,292
kWh
$675
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $241,945 $55,928 $1,918
87,339
kWh
$14,791
-
kW-mo/yr
$9,000 $4,236
-
MMBtu
$191,000 $21,000
TOTAL IMPLEMENTED $207,656 $14,128 $1,540
70,047
kWh
$14,116
-
kW-mo/yr
- - $192,000 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs