ITAC Assessment: UD0541
ITAC logo
ITAC Assessment: UD0541
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Electric Motor Manufacturing equipment, Visual flow indicato
NAICS
n/a
SIC 3548: Electric and Gas Welding and Soldering Equipment
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 30,000
ft2
Annual Production 60
pieces
Production Hrs. Annual 2,205
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,535 482,122
kWh
Electricity Demand $29,040 2,064
kW-mo/yr
Natural Gas $4,672 935
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,610 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,187

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,518 $7,275 $747
28,722
kWh
$1,771
-
kW-mo/yr
- - -
02 2.7111: Reduce illumination to minimum necessary levels $1,187 $400 $301
11,723
kWh
$886
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $368 - $63
2,345
kWh
$305
-
kW-mo/yr
- - -
04 3.2161: Closely monitor chemical additions to increase bath life $336 $200 - - $137 $139 $60
05 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $201 $200 - - $125 $16 $60
TOTAL RECOMMENDED $4,610 $8,075 $1,111
42,790
kWh
$2,962
-
kW-mo/yr
$262 $155 $120
TOTAL IMPLEMENTED $1,187 $400 $301
11,723
kWh
$886
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs