ITAC Assessment: UD0540
ITAC logo
ITAC Assessment: UD0540
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Gears, Sprockets, Splines, & Racks
NAICS
n/a
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $1
M
to 5
M
# of Employees 24
Plant Area 16,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 3,300
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,810 184,936
kWh
Electricity Demand $10,975 780
kW-mo/yr
Natural Gas $4,152 790
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,549 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,935

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,935 $5,622 $652
14,947
kWh
$1,283
-
kW-mo/yr
- -
02 2.8112: Combine utility meters $1,070 $300 - $(-1,182.0)
-
kW-mo/yr
$2,252 -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $624 - $180
7,034
kWh
$444
-
kW-mo/yr
- -
04 4.652: Replace existing equipment with more suitable substitutes $1,920 $2,000 - - - $1,920
TOTAL RECOMMENDED $5,549 $7,922 $832
21,981
kWh
$545
-
kW-mo/yr
$2,252 $1,920
TOTAL IMPLEMENTED $1,935 $5,622 $652
14,947
kWh
$1,283
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs