| Assessment Year | 1998 |
|---|---|
| Principal Product | Automotive Parts |
| NAICS |
n/a
|
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 100 |
| Plant Area |
62,000
ft2
|
| Annual Production | 3,500,000
pieces
|
| Production Hrs. Annual | 6,800
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $52,735 | 2,197,831 |
kWh
|
$0.024 |
| Electricity Demand | $83,238 | 5,916 |
kW-mo/yr
|
$14.07 |
| Natural Gas | $8,518 | 1,747 |
MMBtu
|
$4.88 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,114 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,739 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,739 | $17,011 |
$3,045
113,130
kWh
|
$4,694
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $6,150 | $12,500 |
$5,085
189,039
kWh
|
$4,694
-
kW-mo/yr
|
$(-3,629.0)
-
MMBtu
|
- | - | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $3,884 | $(-6,000.0) |
$633
23,447
kWh
|
$2,651
-
kW-mo/yr
|
- | - | $600 | |
| 04 | 3.3133: Use other waste concentration methods | $3,341 | $15,000 | - | - | - |
$3,341
-
lb
|
- | |
| 05 | 3.5316: Contract a wood pallet recycling company | $2,000 | - | - | - | - | - | $2,000 | |
| TOTAL RECOMMENDED | $23,114 | $38,511 |
$8,763
325,616
kWh
|
$12,039
-
kW-mo/yr
|
$(-3,629.0)
-
MMBtu
|
$3,341
-
lb
|
$2,600 | ||
| TOTAL IMPLEMENTED | $9,739 | $17,011 |
$3,045
113,130
kWh
|
$4,694
-
kW-mo/yr
|
- | - | $2,000 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs