ITAC Assessment: UD0536
ITAC logo
ITAC Assessment: UD0536
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Automotive Parts
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 62,000
ft2
Annual Production 3,500,000
pieces
Production Hrs. Annual 6,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,735 2,197,831
kWh
Electricity Demand $83,238 5,916
kW-mo/yr
Natural Gas $8,518 1,747
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,114 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,739

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,739 $17,011 $3,045
113,130
kWh
$4,694
-
kW-mo/yr
- - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,150 $12,500 $5,085
189,039
kWh
$4,694
-
kW-mo/yr
$(-3,629.0)
-
MMBtu
- -
03 2.4239: Eliminate or reduce compressed air usage $3,884 $(-6,000.0) $633
23,447
kWh
$2,651
-
kW-mo/yr
- - $600
04 3.3133: Use other waste concentration methods $3,341 $15,000 - - - $3,341
-
lb
-
05 3.5316: Contract a wood pallet recycling company $2,000 - - - - - $2,000
TOTAL RECOMMENDED $23,114 $38,511 $8,763
325,616
kWh
$12,039
-
kW-mo/yr
$(-3,629.0)
-
MMBtu
$3,341
-
lb
$2,600
TOTAL IMPLEMENTED $9,739 $17,011 $3,045
113,130
kWh
$4,694
-
kW-mo/yr
- - $2,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs