| Assessment Year | 1997 |
|---|---|
| Principal Product | Extruded Plastic Trim |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
110,000
ft2
|
| Annual Production | 0
thousand feet
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $144,794 | 7,241,794 |
kWh
|
$0.020 |
| Electricity Demand | $213,230 | 15,048 |
kW-mo/yr
|
$14.17 |
| Natural Gas | $70,507 | 13,005 |
MMBtu
|
$5.42 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $63,313 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,300 | $40 | n/a |
$596
29,894
kWh
|
$704
-
kW-mo/yr
|
- | - | - |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,791 | $1,000 | n/a |
$1,084
54,220
kWh
|
$1,707
-
kW-mo/yr
|
- | - | - |
| 03 | 2.3135: Schedule routine maintenance during non-operating periods | $6,041 | - | n/a |
$2,871
143,611
kWh
|
$3,170
-
kW-mo/yr
|
- | - | - |
| 04 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $7,992 | $6,000 | n/a | - | - | - |
$6,552
-
lb
|
$1,440 |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,954 | $5,047 | n/a |
$570
28,429
kWh
|
$1,384
-
kW-mo/yr
|
- | - | - |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,450 | $9,153 | n/a |
$2,041
101,993
kWh
|
$2,409
-
kW-mo/yr
|
- | - | - |
| 07 | 2.2691: Shut off cooling if cold outside air will cool process | $3,203 | $1,000 | n/a |
$1,469
73,564
kWh
|
$1,734
-
kW-mo/yr
|
- | - | - |
| 08 | 2.4133: Use most efficient type of electric motors | $1,420 | $3,456 | n/a |
$651
32,532
kWh
|
$769
-
kW-mo/yr
|
- | - | - |
| 09 | 2.2437: Recover waste heat from equipment | $5,680 | $4,000 | n/a |
$(-72.0)
(-3,517)
kWh
|
$(-85.0)
-
kW-mo/yr
|
$5,837
-
MMBtu
|
- | - |
| 10 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $28,482 | - | n/a | - |
$28,482
-
kW-mo/yr
|
- | - | - |
| TOTAL RECOMMENDED | $63,313 | $29,696 |
$9,210
460,726
kWh
|
$40,274
-
kW-mo/yr
|
$5,837
-
MMBtu
|
$6,552
-
lb
|
$1,440 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs