ITAC Assessment: UD0525
ITAC logo
ITAC Assessment: UD0525
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Extruded Plastic Trim
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 110,000
ft2
Annual Production 0
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,794 7,241,794
kWh
Electricity Demand $213,230 15,048
kW-mo/yr
Natural Gas $70,507 13,005
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,313 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,300 $40 n/a $596
29,894
kWh
$704
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,791 $1,000 n/a $1,084
54,220
kWh
$1,707
-
kW-mo/yr
- - -
03 2.3135: Schedule routine maintenance during non-operating periods $6,041 - n/a $2,871
143,611
kWh
$3,170
-
kW-mo/yr
- - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $7,992 $6,000 n/a - - - $6,552
-
lb
$1,440
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,954 $5,047 n/a $570
28,429
kWh
$1,384
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,450 $9,153 n/a $2,041
101,993
kWh
$2,409
-
kW-mo/yr
- - -
07 2.2691: Shut off cooling if cold outside air will cool process $3,203 $1,000 n/a $1,469
73,564
kWh
$1,734
-
kW-mo/yr
- - -
08 2.4133: Use most efficient type of electric motors $1,420 $3,456 n/a $651
32,532
kWh
$769
-
kW-mo/yr
- - -
09 2.2437: Recover waste heat from equipment $5,680 $4,000 n/a $(-72.0)
(-3,517)
kWh
$(-85.0)
-
kW-mo/yr
$5,837
-
MMBtu
- -
10 2.3131: Reschedule plant operations or reduce load to avoid peaks $28,482 - n/a - $28,482
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $63,313 $29,696 $9,210
460,726
kWh
$40,274
-
kW-mo/yr
$5,837
-
MMBtu
$6,552
-
lb
$1,440
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs