| Assessment Year | 2002 |
|---|---|
| Principal Product | Rebuilds vacuum pumps and equipment |
| NAICS |
n/a
|
| SIC | 3561: Pumps and Pumping Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 55 |
| Plant Area |
49,000
ft2
|
| Annual Production | 3,000
pieces
|
| Production Hrs. Annual | 4,216
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $98,862 | 1,716,160 |
kWh
|
$0.058 |
| Electricity Demand | $11,368 | 4,445 |
kW-mo/yr
|
$2.56 |
| Electricity Fees | $9,118 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $39,444 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7145: Install skylights | $2,558 | $9,946 | n/a |
$2,558
63,947
kWh
|
- | - | - |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,651 | $6,651 | n/a |
$3,786
94,644
kWh
|
$2,865
-
kW-mo/yr
|
- | - |
| 03 | 2.7314: Reduce ventilation air | $2,184 | $1,320 | n/a |
$1,184
29,601
kWh
|
$1,000
-
kW-mo/yr
|
- | - |
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $3,123 | $7,350 | n/a |
$1,505
37,613
kWh
|
$1,618
-
kW-mo/yr
|
- | - |
| 05 | 2.4314: Use synthetic lubricant | $645 | $465 | n/a |
$237
5,918
kWh
|
$221
-
kW-mo/yr
|
- | $187 |
| 06 | 3.6192: Use a less expensive method of waste removal | $4,380 | $60 | n/a | - | - | - | $4,380 |
| 07 | 3.6192: Use a less expensive method of waste removal | $1,932 | $60 | n/a | - | - | - | $1,932 |
| 08 | 4.111: Add equipment/ operators to reduce production bottleneck | $17,971 | $374 | n/a | - | - | $17,971 | - |
| TOTAL RECOMMENDED | $39,444 | $26,226 |
$9,270
231,723
kWh
|
$5,704
-
kW-mo/yr
|
$17,971 | $6,499 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs