ITAC Assessment: AS0320
ITAC logo
ITAC Assessment: AS0320
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Rebuilds vacuum pumps and equipment
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 49,000
ft2
Annual Production 3,000
pieces
Production Hrs. Annual 4,216
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,862 1,716,160
kWh
Electricity Demand $11,368 4,445
kW-mo/yr
Electricity Fees $9,118 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,444 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.7145: Install skylights $2,558 $9,946 n/a $2,558
63,947
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,651 $6,651 n/a $3,786
94,644
kWh
$2,865
-
kW-mo/yr
- -
03 2.7314: Reduce ventilation air $2,184 $1,320 n/a $1,184
29,601
kWh
$1,000
-
kW-mo/yr
- -
04 2.7232: Replace existing hvac unit with high efficiency model $3,123 $7,350 n/a $1,505
37,613
kWh
$1,618
-
kW-mo/yr
- -
05 2.4314: Use synthetic lubricant $645 $465 n/a $237
5,918
kWh
$221
-
kW-mo/yr
- $187
06 3.6192: Use a less expensive method of waste removal $4,380 $60 n/a - - - $4,380
07 3.6192: Use a less expensive method of waste removal $1,932 $60 n/a - - - $1,932
08 4.111: Add equipment/ operators to reduce production bottleneck $17,971 $374 n/a - - $17,971 -
TOTAL RECOMMENDED $39,444 $26,226 $9,270
231,723
kWh
$5,704
-
kW-mo/yr
$17,971 $6,499
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs