Assessment Year | 1997 |
---|---|
Principal Product | Aluminum Castings |
NAICS |
n/a
|
SIC | 3365: Aluminum Foundries |
Sales Range | $5 M to 10M |
# of Employees | 212 |
Plant Area |
120,000
ft2
|
Annual Production | 0
lb
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $204,961 | 3,292,790 |
kWh
|
$0.062 |
Electricity Demand | $141,030 | 9,000 |
kW-mo/yr
|
$15.67 |
Natural Gas | $354,752 | 64,058 |
MMBtu
|
$5.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $211,915 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $79,041 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $36,109 | $60,000 |
$(-125.0)
(-5,862)
kWh
|
$(-375.0)
-
kW-mo/yr
|
$36,609
-
MMBtu
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,688 | $11,020 |
$1,600
76,202
kWh
|
$3,088
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.8211: Consolidate freight shipments and/or deliveries | $34,031 | $25,000 | - | - | - | - | $8,250 | $20,625 | $5,156 | |
04 | 4.423: Move product using mechanical means | $67,125 | $2,500 | - | - | - | - | $54,000 | - | $13,125 | |
05 | 4.423: Move product using mechanical means | $19,500 | $8,000 | - | - | - | - | $19,500 | - | - | |
06 | 3.3113: Use other methods for neutralization | $5,655 | $500 | - | - | - |
$5,655
-
gal
|
- | - | - | |
07 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $2,789 | $200 | - | - |
$2,789
-
MMBtu
|
- | - | - | - | |
08 | 2.5195: Change product design to reduce energy requirements | $1,875 | - | - | - |
$1,875
-
MMBtu
|
- | - | - | - | |
09 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $40,143 | $150,000 |
$16,067
765,240
kWh
|
$42,121
-
kW-mo/yr
|
$(-18,045.0)
-
MMBtu
|
- | - | - | - | |
TOTAL RECOMMENDED | $211,915 | $257,220 |
$17,542
835,580
kWh
|
$44,834
-
kW-mo/yr
|
$23,228
-
MMBtu
|
$5,655
-
gal
|
$81,750 | $20,625 | $18,281 | ||
TOTAL IMPLEMENTED | $79,041 | $210,200 |
$15,942
759,378
kWh
|
$41,746
-
kW-mo/yr
|
$21,353
-
MMBtu
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs