ITAC Assessment: UD0513
ITAC logo
ITAC Assessment: UD0513
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product organic chemicals
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 200,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $969,867 21,411,489
kWh
Electricity Demand $383,939 34,704
kW-mo/yr
Natural Gas $590,298 158,619
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $508,655 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,120

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 3.4115: Recover and reuse cooling water $82,051 $370,000 $(-523.0)
(-25,205)
kWh
$(-503.0)
-
kW-mo/yr
$83,077
-
Tgal
02 3.4115: Recover and reuse cooling water $82,538 $50,000 $(-277.0)
(-13,189)
kWh
$(-262.0)
-
kW-mo/yr
$83,077
-
Tgal
03 3.4154: Eliminate leaks in water lines and valves $195,658 $50,000 - - $195,658
-
Tgal
04 2.3212: Optimize plant power factor $21,006 $25,000 - $21,006
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $3,283 $6,465 $1,259
60,082
kWh
$2,024
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $10,603 $19,910 $4,307
205,158
kWh
$6,296
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,228 $16,000 $1,659
79,132
kWh
$1,569
-
kW-mo/yr
-
08 3.4116: Meter recycled water (to reduce sewer charges) $110,288 $500 - - $110,288
-
Tgal
TOTAL RECOMMENDED $508,655 $537,875 $6,425
305,978
kWh
$30,130
-
kW-mo/yr
$472,100
-
Tgal
TOTAL IMPLEMENTED $38,120 $67,375 $7,225
344,372
kWh
$30,895
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs