ITAC Assessment: UD0508
ITAC logo
ITAC Assessment: UD0508
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product silicon wafers
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 21,000
ft2
Annual Production 400,000
thousand feet
Production Hrs. Annual 8,700
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $450,747 21,267,878
kWh
Electricity Demand $497,781 34,932
kW-mo/yr
Electricity Fees $7,200 -
Natural Gas $27,919 6,513
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $306,671 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $297,021

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Primary Product Savings
01 2.3212: Optimize plant power factor $7,200 $60,000 - $7,200
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,088 $2,314 $366
15,826
kWh
$722
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,041 $8,081 $2,659
125,440
kWh
$2,382
-
kW-mo/yr
- - -
04 3.4111: Use closed cycle process to minimize waste water production $31,719 $11,000 - - $31,719
-
Tgal
- -
05 3.1161: Eliminate/reduce an operation $9,650 $5,000 - - - $9,650 -
06 3.1161: Eliminate/reduce an operation $8,523 - - - - $8,523 -
07 2.2614: Use cooling tower or economizer to replace chiller cooling $101,584 $40,000 $56,098
2,646,249
kWh
$45,486
-
kW-mo/yr
- - -
08 4.631: Install an uninteruptable power supply $135,600 $222,868 - - - - $135,600
09 2.4133: Use most efficient type of electric motors $1,158 $2,286 $601
28,429
kWh
$557
-
kW-mo/yr
- - -
10 3.4115: Recover and reuse cooling water $5,108 $5,000 - - $6,108
-
Tgal
$(-1,000.0) -
TOTAL RECOMMENDED $306,671 $356,549 $59,724
2,815,944
kWh
$56,347
-
kW-mo/yr
$37,827
-
Tgal
$17,173 $135,600
TOTAL IMPLEMENTED $297,021 $351,549 $59,724
2,815,944
kWh
$56,347
-
kW-mo/yr
$37,827
-
Tgal
$7,523 $135,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs