ITAC Assessment: UD0499
ITAC logo
ITAC Assessment: UD0499
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product pies and cakes
NAICS
n/a
SIC 2053: Frozen Bakery Products, Except Bread
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 85,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,240 3,008,499
kWh
Electricity Demand $88,788 7,331
kW-mo/yr
Natural Gas $43,499 9,309
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,721 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $4,543 $3,000 - $4,543
-
kW-mo/yr
- - -
02 2.8123: Pay utility bills on time $879 - - - - - $879
03 3.4116: Meter recycled water (to reduce sewer charges) $1,661 $300 - - - $1,805
-
Tgal
$(-144.0)
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,886 $3,500 $1,840
87,632
kWh
$1,880
-
kW-mo/yr
$(-1,834.0)
-
MMBtu
- -
05 2.8112: Combine utility meters $311 $1,000 - - - - $311
06 2.2122: Install / repair insulation on condensate lines $251 $604 - - $251
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,408 $3,528 $338
16,120
kWh
$1,070
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $336 $910 $119
5,569
kWh
$237
-
kW-mo/yr
- - $(-20.0)
09 2.7142: Utilize higher efficiency lamps and/or ballasts $474 $420 $133
6,448
kWh
$344
-
kW-mo/yr
- - $(-3.0)
10 2.7111: Reduce illumination to minimum necessary levels $972 - $299
14,361
kWh
$612
-
kW-mo/yr
- - $61
TOTAL RECOMMENDED $12,721 $13,262 $2,729
130,130
kWh
$8,686
-
kW-mo/yr
$(-1,583.0)
-
MMBtu
$1,805
-
Tgal
$1,084
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs