ITAC Assessment: UD0497
ITAC logo
ITAC Assessment: UD0497
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product environmental control equipment
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 119,300
ft2
Annual Production 1,100
pieces
Production Hrs. Annual 2,300
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,350 1,451,348
kWh
Electricity Demand $58,709 4,848
kW-mo/yr
Natural Gas $13,212 2,773
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,795

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $1,514 $1,500 - $1,514
-
kW-mo/yr
- -
02 3.4116: Meter recycled water (to reduce sewer charges) $1,460 $300 - - $1,460
-
Tgal
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,035 $20,230 $2,765
86,460
kWh
$4,914
-
kW-mo/yr
- $356
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,760 $13,724 $1,354
42,204
kWh
$2,406
-
kW-mo/yr
- -
TOTAL RECOMMENDED $14,769 $35,754 $4,119
128,664
kWh
$8,834
-
kW-mo/yr
$1,460
-
Tgal
$356
TOTAL IMPLEMENTED $11,795 $33,954 $4,119
128,664
kWh
$7,320
-
kW-mo/yr
- $356
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs