ITAC Assessment: UD0496
ITAC logo
ITAC Assessment: UD0496
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product corrugated boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 64
Plant Area 130,800
ft2
Annual Production 25,000
lb
Production Hrs. Annual 4,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,911 3,738,570
kWh
Electricity Demand $125,847 10,392
kW-mo/yr
Natural Gas $104,062 35,073
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,405

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,040 $1,500 - - $2,040
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,270 $5,000 $1,680
80,012
kWh
$3,760
-
kW-mo/yr
$(-1,170.0)
-
MMBtu
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $17,005 $30,000 $6,615
315,064
kWh
$15,790
-
kW-mo/yr
$(-5,400.0)
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $365 $1,720 $116
5,569
kWh
$231
-
kW-mo/yr
- $18
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,485 $18,550 $2,429
115,768
kWh
$4,832
-
kW-mo/yr
$(-776.0)
-
MMBtu
-
TOTAL RECOMMENDED $30,165 $56,770 $10,840
516,413
kWh
$24,613
-
kW-mo/yr
$(-5,306.0)
-
MMBtu
$18
TOTAL IMPLEMENTED $2,405 $3,220 $116
5,569
kWh
$231
-
kW-mo/yr
$2,040
-
MMBtu
$18
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs