ITAC Assessment: UD0495
ITAC logo
ITAC Assessment: UD0495
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product automotive struts
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 276
Plant Area 162,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 8,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $523,533 15,342,028
kWh
Electricity Demand $290,952 32,328
kW-mo/yr
Natural Gas $55,981 11,234
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,054 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,039

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $16,063 $6,000 $8,024
235,932
kWh
$6,372
-
kW-mo/yr
- $1,667
02 2.4239: Eliminate or reduce compressed air usage $11,867 - $10,200
300,117
kWh
- - $1,667
03 2.4239: Eliminate or reduce compressed air usage $3,571 - $3,071
90,270
kWh
- - $500
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,015 $17,260 $5,725
168,523
kWh
$3,145
-
kW-mo/yr
$145 -
05 2.3137: Use power during off-peak periods $24,538 - - $24,538
-
kW-mo/yr
- -
TOTAL RECOMMENDED $65,054 $23,260 $27,020
794,842
kWh
$34,055
-
kW-mo/yr
$145 $3,834
TOTAL IMPLEMENTED $56,039 $6,000 $21,295
626,319
kWh
$30,910
-
kW-mo/yr
- $3,834
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs