ITAC Assessment: UD0486
ITAC logo
ITAC Assessment: UD0486
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product exhaust system fasteners
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 55,000
ft2
Annual Production 0
units
Production Hrs. Annual 3,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,286 949,590
kWh
Electricity Demand $50,717 4,188
kW-mo/yr
Natural Gas $7,138 1,480
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,028 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,028

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $558 - $202
7,620
kWh
$492
-
kW-mo/yr
$(-136.0)
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,870 - $2,940
109,027
kWh
$5,910
-
kW-mo/yr
$(-660.0)
-
MMBtu
- $680
03 2.2437: Recover waste heat from equipment $360 $1,000 - - $360
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,390 $7,435 $1,060
39,273
kWh
$2,330
-
kW-mo/yr
- - -
05 3.4115: Recover and reuse cooling water $2,850 $17,500 - - - $2,850
-
gal
-
TOTAL RECOMMENDED $16,028 $25,935 $4,202
155,920
kWh
$8,732
-
kW-mo/yr
$(-436.0)
-
MMBtu
$2,850
-
gal
$680
TOTAL IMPLEMENTED $16,028 $25,935 $4,202
155,920
kWh
$8,732
-
kW-mo/yr
$(-436.0)
-
MMBtu
$2,850
-
gal
$680
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs