Assessment Year | 1996 |
---|---|
Principal Product | exhaust system fasteners |
NAICS |
n/a
|
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
55,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $34,286 | 949,590 |
kWh
|
$0.036 |
Electricity Demand | $50,717 | 4,188 |
kW-mo/yr
|
$12.11 |
Natural Gas | $7,138 | 1,480 |
MMBtu
|
$4.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,028 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,028 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $558 | - |
$202
7,620
kWh
|
$492
-
kW-mo/yr
|
$(-136.0)
-
MMBtu
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,870 | - |
$2,940
109,027
kWh
|
$5,910
-
kW-mo/yr
|
$(-660.0)
-
MMBtu
|
- | $680 | |
03 | 2.2437: Recover waste heat from equipment | $360 | $1,000 | - | - |
$360
-
MMBtu
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,390 | $7,435 |
$1,060
39,273
kWh
|
$2,330
-
kW-mo/yr
|
- | - | - | |
05 | 3.4115: Recover and reuse cooling water | $2,850 | $17,500 | - | - | - |
$2,850
-
gal
|
- | |
TOTAL RECOMMENDED | $16,028 | $25,935 |
$4,202
155,920
kWh
|
$8,732
-
kW-mo/yr
|
$(-436.0)
-
MMBtu
|
$2,850
-
gal
|
$680 | ||
TOTAL IMPLEMENTED | $16,028 | $25,935 |
$4,202
155,920
kWh
|
$8,732
-
kW-mo/yr
|
$(-436.0)
-
MMBtu
|
$2,850
-
gal
|
$680 |