ITAC Assessment: NC0297
ITAC logo
ITAC Assessment: NC0297
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product CV Joint Forging
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 92,000
ft2
Annual Production 13,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $579,073 15,731,400
kWh
Electricity Demand $335,922 32,773
kW-mo/yr
Electricity Fees $32,064 -
Natural Gas $142,450 18,474
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,019 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,019

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.1133: Adjust burners for efficient operation $2,652 $1,000 - - $2,652
-
MMBtu
-
02 2.1232: Keep boiler tubes clean $1,635 $800 - - $1,635
-
MMBtu
-
03 2.2123: Insulate feedwater tank $547 $1,500 - - $247
-
MMBtu
$300
04 2.7111: Reduce illumination to minimum necessary levels $13,319 $1,950 $9,641
261,924
kWh
$3,678
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $846 $1,400 $542
14,717
kWh
$206
-
kW-mo/yr
- $98
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,920 $4,114 $1,390
37,773
kWh
$530
-
kW-mo/yr
- -
07 2.7134: Use photocell controls $100 $130 $57
1,533
kWh
$43
-
kW-mo/yr
- -
TOTAL RECOMMENDED $21,019 $10,894 $11,630
315,947
kWh
$4,457
-
kW-mo/yr
$4,534
-
MMBtu
$398
TOTAL IMPLEMENTED $21,019 $10,894 $11,630
315,947
kWh
$4,457
-
kW-mo/yr
$4,534
-
MMBtu
$398
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs