| Assessment Year | 2004 |
|---|---|
| Principal Product | CV Joint Forging |
| NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
92,000
ft2
|
| Annual Production | 13,000,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $579,073 | 15,731,400 |
kWh
|
$0.037 |
| Electricity Demand | $335,922 | 32,773 |
kW-mo/yr
|
$10.25 |
| Electricity Fees | $32,064 | - |
|
- |
| Natural Gas | $142,450 | 18,474 |
MMBtu
|
$7.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $21,019 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $21,019 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1133: Adjust burners for efficient operation | $2,652 | $1,000 | - | - |
$2,652
-
MMBtu
|
- | |
| 02 | 2.1232: Keep boiler tubes clean | $1,635 | $800 | - | - |
$1,635
-
MMBtu
|
- | |
| 03 | 2.2123: Insulate feedwater tank | $547 | $1,500 | - | - |
$247
-
MMBtu
|
$300 | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $13,319 | $1,950 |
$9,641
261,924
kWh
|
$3,678
-
kW-mo/yr
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $846 | $1,400 |
$542
14,717
kWh
|
$206
-
kW-mo/yr
|
- | $98 | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,920 | $4,114 |
$1,390
37,773
kWh
|
$530
-
kW-mo/yr
|
- | - | |
| 07 | 2.7134: Use photocell controls | $100 | $130 |
$57
1,533
kWh
|
$43
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $21,019 | $10,894 |
$11,630
315,947
kWh
|
$4,457
-
kW-mo/yr
|
$4,534
-
MMBtu
|
$398 | ||
| TOTAL IMPLEMENTED | $21,019 | $10,894 |
$11,630
315,947
kWh
|
$4,457
-
kW-mo/yr
|
$4,534
-
MMBtu
|
$398 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs