Assessment Year | 1996 |
---|---|
Principal Product | aluminum wheels |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 230 |
Plant Area |
240,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 8,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $561,495 | 23,788,687 |
kWh
|
$0.024 |
Electricity Demand | $499,496 | 45,731 |
kW-mo/yr
|
$10.92 |
Natural Gas | $688,303 | 240,300 |
MMBtu
|
$2.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $94,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,722 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $17,762 | $53,000 | - | - |
$17,762
-
MMBtu
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $43,980 | $20,000 |
$15,943
759,379
kWh
|
$25,317
-
kW-mo/yr
|
- | - | - | - | $2,720 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,134 | $10,224 |
$1,075
51,290
kWh
|
$2,059
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,452 | $30,000 |
$4,307
205,158
kWh
|
$4,945
-
kW-mo/yr
|
- | - | - | $1,200 | - | |
05 | 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid | $5,850 | - | - | - | - |
$350
-
Tgal
|
$5,500
-
gal
|
- | - | |
06 | 3.4155: Meter waste water | $7,722 | $1,000 | - | - | - |
$(-78.0)
-
Tgal
|
$7,800
-
gal
|
- | - | |
07 | 3.4156: Use flow control valves on equipment to optimize water use | $6,000 | $6,000 | - | - | - | - |
$6,000
-
gal
|
- | - | |
TOTAL RECOMMENDED | $94,900 | $120,224 |
$21,325
1,015,827
kWh
|
$32,321
-
kW-mo/yr
|
$17,762
-
MMBtu
|
$272
-
Tgal
|
$19,300
-
gal
|
$1,200 | $2,720 | ||
TOTAL IMPLEMENTED | $7,722 | $1,000 | - | - | - |
$(-78.0)
-
Tgal
|
$7,800
-
gal
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |