Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product tools and dies
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 40,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,788 574,443
kWh
Natural Gas $11,932 2,498
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,589 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,036

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4237: Substitute compressed air cooling with water or air cooling $12,036 $15,000 $12,036
158,558
kWh
- -
02 2.2437: Recover waste heat from equipment $619 $2,500 - $619
-
MMBtu
-
03 2.7122: Disconnect ballasts $934 $100 $1,029
15,240
kWh
$(-157.0)
-
MMBtu
$62
TOTAL RECOMMENDED $13,589 $17,600 $13,065
173,798
kWh
$462
-
MMBtu
$62
TOTAL IMPLEMENTED $12,036 $15,000 $12,036
158,558
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs