| Assessment Year | 1994 |
|---|---|
| Principal Product | FOLDING PAPER CARTONS |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $50 M to 100M |
| # of Employees | 250 |
| Plant Area |
300,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $498,179 | 8,072,685 |
kWh
|
$0.062 |
| Natural Gas | $307,216 | 47,108 |
MMBtu
|
$6.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $65,330 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $24,910 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $12,358 | $1,420 |
$12,358
202,814
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,577 | $2,946 |
$10,577
173,505
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,562 | $360 |
$5,562
91,149
kWh
|
- | |
| 04 | 2.4133: Use most efficient type of electric motors | $8,771 | $10,880 |
$8,771
143,904
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,875 | $16,390 |
$7,875
129,250
kWh
|
- | |
| 06 | 2.7243: Improve air circulation with destratification fans / other methods | $2,360 | $4,000 | - |
$2,360
-
MMBtu
|
|
| 07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,700 | - |
$2,700
-
kWh
|
- | |
| 08 | 2.2443: Re-use or recycle hot or cold process exhaust air | $15,127 | $25,000 | - |
$15,127
-
MMBtu
|
|
| TOTAL RECOMMENDED | $65,330 | $60,996 |
$47,843
740,622
kWh
|
$17,487
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $24,910 | $14,186 |
$24,910
408,558
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs