ITAC Assessment: UD0469
ITAC logo
ITAC Assessment: UD0469
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product plastic illuminated signs
NAICS
n/a
SIC 3993: Signs and Advertising Specialties
Sales Range $10
M
to 50
M
# of Employees 137
Plant Area 212,500
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,020 2,327,374
kWh
Natural Gas $34,800 8,190
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,585 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,483

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings Primary Raw Material Savings
01 2.8112: Combine utility meters $3,256 - $3,256
-
kWh
- - - - - -
02 2.6242: Minimize operation of equipment maintained in standby condition $2,980 $3,000 $2,961
32,532
kWh
$(-231.0)
-
MMBtu
- - - - $250
03 2.7142: Utilize higher efficiency lamps and/or ballasts $227 $392 $227
3,517
kWh
- - - - - -
04 3.6192: Use a less expensive method of waste removal $1,522 $1,000 - - $960
-
gal
- $162
-
lb
$400 -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,600 $20,000 - - - $7,600
-
lb
- - -
TOTAL RECOMMENDED $15,585 $24,392 $6,444
36,049
kWh
$(-231.0)
-
MMBtu
$960
-
gal
$7,600
-
lb
$162
-
lb
$400 $250
TOTAL IMPLEMENTED $3,483 $392 $3,483
3,517
kWh
- - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs