ITAC Assessment: MA0856
ITAC logo
ITAC Assessment: MA0856
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area 11,300
ft2
Annual Production 334,869
Tgal
Production Hrs. Annual 3,600
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,308 614,700
kWh
Electricity Demand $16,354 1,894
kW-mo/yr
Electricity Fees $2,984 -
Natural Gas $9,830 596
MMBtu
TOTAL YEARLY COSTS $122,476
RECOMMENDED SAVINGS* $59,284 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.9114: Use solar heat to make electricty $47,289 $222,915 $31,776
209,052
kWh
$691
-
kW-mo/yr
$14,822
02 2.6124: Establish equipment maintenance schedule $7,517 $23,709 $6,999
46,063
kWh
$518
-
kW-mo/yr
-
03 3.1191: Change procedures / equipment / operating conditions $859 $900 $859
5,653
kWh
- -
04 2.7234: Use heat pump for space conditioning $2,528 $1,450 $2,346
15,433
kWh
$182
-
kW-mo/yr
-
05 2.7234: Use heat pump for space conditioning $1,091 $385 $1,014
6,674
kWh
$77
-
kW-mo/yr
-
TOTAL RECOMMENDED $59,284 $249,359 $42,994
282,875
kWh
$1,468
-
kW-mo/yr
$14,822
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs