ITAC Assessment: UD0468
ITAC logo
ITAC Assessment: UD0468
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product clutch assemblies, power steering pumps, rear differentials
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 439,000
ft2
Annual Production 110,000
pieces
Production Hrs. Annual 8,200
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $383,319 7,214,830
kWh
Natural Gas $45,650 8,372
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,948 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,512

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $5,436 $10,000 $5,436
-
kWh
- -
02 2.8113: Purchase gas directly from a contract gas supplier $10,000 $25,000 - - $10,000
03 2.7124: Make a practice of turning off lights when not needed $2,738 $1,000 $2,709
53,341
kWh
$(-355.0)
-
MMBtu
$384
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,406 $30,850 $11,406
197,538
kWh
- -
05 2.7122: Disconnect ballasts $3,368 $3,000 $3,572
70,926
kWh
$(-470.0)
-
MMBtu
$266
TOTAL RECOMMENDED $32,948 $69,850 $23,123
321,805
kWh
$(-825.0)
-
MMBtu
$10,650
TOTAL IMPLEMENTED $17,512 $34,850 $17,687
321,805
kWh
$(-825.0)
-
MMBtu
$650
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs