ITAC Assessment: UD0467
ITAC logo
ITAC Assessment: UD0467
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product electronic components
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 228,000
ft2
Annual Production 0
units
Production Hrs. Annual 3,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $499,308 9,538,394
kWh
Natural Gas $161,397 34,387
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,569 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,434

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings Water Consumption Savings
01 2.8113: Purchase gas directly from a contract gas supplier $68,000 $72,000 - $68,000 -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,434 $3,000 $5,434
259,965
kWh
- -
03 2.2622: Replace existing chiller with high efficiency model $23,135 $150,000 $21,035
481,243
kWh
- $2,100
-
Tgal
TOTAL RECOMMENDED $96,569 $225,000 $26,469
741,208
kWh
$68,000 $2,100
-
Tgal
TOTAL IMPLEMENTED $73,434 $75,000 $5,434
259,965
kWh
$68,000 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs