ITAC Assessment: UD0460
ITAC logo
ITAC Assessment: UD0460
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product plastic injection molding
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 40,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $284,285 4,674,971
kWh
Natural Gas $9,570 1,903
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,311 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,870

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $41,888 $30,000 $41,888
-
kWh
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,025 - $11,025
321,512
kWh
- -
03 2.2437: Recover waste heat from equipment $1,416 $3,000 - $1,416
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,670 $5,216 $1,458
26,377
kWh
- $212
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,312 $4,077 $2,312
37,808
kWh
- -
TOTAL RECOMMENDED $58,311 $42,293 $56,683
385,697
kWh
$1,416
-
MMBtu
$212
TOTAL IMPLEMENTED $45,870 $39,293 $45,658
64,185
kWh
- $212
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs