ITAC Assessment: UD0457
ITAC logo
ITAC Assessment: UD0457
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product aqueous degreasing washers
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 66,000
ft2
Annual Production 130
pieces
Production Hrs. Annual 3,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,510 893,025
kWh
Natural Gas $3,063 562
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,613 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,001

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,868 $200 $4,868
-
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,446 - $2,446
-
kWh
-
03 2.2437: Recover waste heat from equipment $612 $2,000 - $612
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $687 $1,625 $687
8,206
kWh
-
TOTAL RECOMMENDED $8,613 $3,825 $8,001
8,206
kWh
$612
-
MMBtu
TOTAL IMPLEMENTED $8,001 $1,825 $8,001
8,206
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs