Assessment Year | 1995 |
---|---|
Principal Product | storage drums, kegs |
NAICS |
n/a
|
SIC | 3412: Metal Shipping Barrels, Drums, Kegs, and Pails |
Sales Range | $10 M to 50M |
# of Employees | 88 |
Plant Area |
81,000
ft2
|
Annual Production | 900,000
pieces
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $223,136 | 3,356,682 |
kWh
|
$0.066 |
Natural Gas | $165,000 | 52,678 |
MMBtu
|
$3.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $93,367 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $66,513 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $5,558 | $9,500 |
$5,558
-
kWh
|
- | - | - | - | |
02 | 2.8113: Purchase gas directly from a contract gas supplier | $18,240 | $80,000 | - | - | - | - | $18,240 | |
03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $19,024 | $17,000 |
$16,908
302,755
kWh
|
- | - | - | $2,116 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,503 | $2,989 |
$1,503
17,878
kWh
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $380 | $4,400 |
$330
4,982
kWh
|
- | - | - | $50 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,695 | $1,320 |
$1,760
27,843
kWh
|
$(-65.0)
-
MMBtu
|
- | - | - | |
07 | 2.2424: Use heat in flue gases to preheat products or materials | $4,193 | $3,000 | - |
$4,193
-
MMBtu
|
- | - | - | |
08 | 3.4155: Meter waste water | $1,754 | $600 | - | - |
$1,754
-
Tgal
|
- | - | |
09 | 3.2136: Use "wash-less" processing equipment | $41,020 | $8,000 |
$2,370
37,222
kWh
|
- | - |
$38,650
-
gal
|
- | |
TOTAL RECOMMENDED | $93,367 | $126,809 |
$28,429
390,680
kWh
|
$4,128
-
MMBtu
|
$1,754
-
Tgal
|
$38,650
-
gal
|
$20,406 | ||
TOTAL IMPLEMENTED | $66,513 | $98,820 |
$9,688
65,065
kWh
|
$(-65.0)
-
MMBtu
|
- |
$38,650
-
gal
|
$18,240 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs