ITAC Assessment: UD0442
ITAC logo
ITAC Assessment: UD0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product innerspring units
NAICS
n/a
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $10
M
to 50
M
# of Employees 331
Plant Area 219,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $347,485 7,443,435
kWh
Natural Gas $91,645 16,673
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,047 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,712

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 3.7212: Improved material handling (mixing and transfer) $3,914 - - - - $3,914
02 2.8113: Purchase gas directly from a contract gas supplier $3,335 - - - $3,335 -
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $12,118 $1,000 $11,740
541,032
kWh
$(-2,822.0)
-
MMBtu
$3,200 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,818 $3,360 $1,818
32,825
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,952 $6,200 $1,952
89,977
kWh
- - -
06 2.2437: Recover waste heat from equipment $8,910 $10,000 - $8,910
-
MMBtu
- -
TOTAL RECOMMENDED $32,047 $20,560 $15,510
663,834
kWh
$6,088
-
MMBtu
$6,535 $3,914
TOTAL IMPLEMENTED $28,712 $20,560 $15,510
663,834
kWh
$6,088
-
MMBtu
$3,200 $3,914
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs