ITAC Assessment: UD0439
ITAC logo
ITAC Assessment: UD0439
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product plastic injection molding
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 30,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,563 1,820,340
kWh
Natural Gas $10,709 2,109
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,353 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8112: Combine utility meters $2,398 - - - $2,398
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,009 - $1,009
-
kWh
- -
03 2.2437: Recover waste heat from equipment $1,183 $1,500 $285
4,982
kWh
$898
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,763 $12,575 $4,763
75,029
kWh
- -
TOTAL RECOMMENDED $9,353 $14,075 $6,057
80,011
kWh
$898
-
MMBtu
$2,398
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs