| Assessment Year | 1994 |
|---|---|
| Principal Product | flexible packaging for food industry |
| NAICS |
n/a
|
| SIC | 2754: Commercial Printing, Gravure |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
162,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 7,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $706,596 | 12,992,380 |
kWh
|
$0.054 |
| Natural Gas | $244,660 | 83,827 |
MMBtu
|
$2.92 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $65,953 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $39,327 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $23,133 | $30,000 |
$35,785
824,150
kWh
|
$(-12,652.0)
-
MMBtu
|
|
| 02 | 2.4133: Use most efficient type of electric motors | $7,289 | $8,288 |
$7,289
137,163
kWh
|
- | |
| 03 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $14,232 | $27,000 | - |
$14,232
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,367 | $6,625 |
$2,367
30,774
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,090 | $17,120 |
$6,090
95,545
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,413 | $1,088 |
$1,413
21,688
kWh
|
- | |
| 07 | 2.6218: Turn off equipment when not in use | $549 | - |
$549
24,619
kWh
|
- | |
| 08 | 2.3212: Optimize plant power factor | $2,880 | $36,000 |
$2,880
-
kWh
|
- | |
| 09 | 2.2437: Recover waste heat from equipment | $8,000 | $40,000 |
$(-2,935.0)
(-134,525)
kWh
|
$10,935
-
MMBtu
|
|
| TOTAL RECOMMENDED | $65,953 | $166,121 |
$53,438
999,414
kWh
|
$12,515
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $39,327 | $58,088 |
$37,747
870,457
kWh
|
$1,580
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs