ITAC Assessment: UD0425
ITAC logo
ITAC Assessment: UD0425
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product flux-cored welding wire
NAICS
n/a
SIC 3548: Electric and Gas Welding and Soldering Equipment
Sales Range $10
M
to 50
M
# of Employees 139
Plant Area 108,000
ft2
Annual Production 37,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $354,202 8,121,923
kWh
Natural Gas $19,191 3,943
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,774 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,748

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,450 - $2,450
79,719
kWh
- -
02 3.1191: Change procedures / equipment / operating conditions $9,026 - $9,026
293,962
kWh
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $398 $3,000 $4,298
140,094
kWh
$(-3,900.0)
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,545 $15,950 $4,545
148,007
kWh
- -
05 2.8112: Combine utility meters $355 - - - $355
TOTAL RECOMMENDED $16,774 $18,950 $20,319
661,782
kWh
$(-3,900.0)
-
MMBtu
$355
TOTAL IMPLEMENTED $7,748 $18,950 $11,293
367,820
kWh
$(-3,900.0)
-
MMBtu
$355
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs