ITAC Assessment: UD0424
ITAC logo
ITAC Assessment: UD0424
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product thermoplastic seals, pistons
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area 42,000
ft2
Annual Production 153,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,914,000 29,427,316
kWh
Natural Gas $18,636 3,860
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,616 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,077

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,026 - $1,026
-
kWh
- -
02 3.1191: Change procedures / equipment / operating conditions $539 - $539
-
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $3,051 $2,500 $3,403
154,162
kWh
$(-1,532.0)
-
MMBtu
$1,180
TOTAL RECOMMENDED $4,616 $2,500 $4,968
154,162
kWh
$(-1,532.0)
-
MMBtu
$1,180
TOTAL IMPLEMENTED $4,077 $2,500 $4,429
154,162
kWh
$(-1,532.0)
-
MMBtu
$1,180
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs