ITAC Assessment: UD0421
ITAC logo
ITAC Assessment: UD0421
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product flavors
NAICS
n/a
SIC 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 116,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $336,287 6,613,423
kWh
Natural Gas $323,146 65,062
MMBtu
Other Energy $303,143 78,340
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $216,972 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,154

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings Water Consumption Savings
01 2.8113: Purchase gas directly from a contract gas supplier $61,963 $15,000 - - - $61,963 -
02 2.8114: Change rate schedules or other changes in utility service $25,164 $30,000 - - - $25,164 -
03 3.4151: Minimize water usage $65,878 $40,000 - - $65,878
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $23,191 $37,559 $20,867
388,042
kWh
- - $2,324 -
05 2.3191: Use demand controller or load shedder $32,472 $30,000 $32,472
-
kWh
- - - -
06 2.2113: Repair or replace steam traps $8,304 $10,000 - $6,614
-
MMBtu
- - $1,690
-
Tgal
TOTAL RECOMMENDED $216,972 $162,559 $53,339
388,042
kWh
$6,614
-
MMBtu
$65,878
-
MMBtu
$89,451 $1,690
-
Tgal
TOTAL IMPLEMENTED $85,154 $52,559 $20,867
388,042
kWh
- - $64,287 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs