ITAC Assessment: UD0413
ITAC logo
ITAC Assessment: UD0413
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Punches and Dies
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area 32,600
ft2
Annual Production 0
units
Production Hrs. Annual 4,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,763 1,318,288
kWh
Natural Gas $12,526 2,438
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,498 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,843

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3191: Use demand controller or load shedder $2,642 - $2,642
-
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $655 - $655
18,464
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,521 $7,698 $2,521
21,981
kWh
04 2.7492: Use proper thickness of insulation on building envelope $1,336 $82,000 $1,336
17,585
kWh
05 2.3191: Use demand controller or load shedder $4,344 $250 $4,344
-
kWh
TOTAL RECOMMENDED $11,498 $89,948 $11,498
58,030
kWh
TOTAL IMPLEMENTED $10,843 $89,948 $10,843
39,566
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs