Assessment Year | 1993 |
---|---|
Principal Product | Punches and Dies |
NAICS |
n/a
|
SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
Sales Range | $10 M to 50M |
# of Employees | 107 |
Plant Area |
32,600
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $91,763 | 1,318,288 |
kWh
|
$0.070 |
Natural Gas | $12,526 | 2,438 |
MMBtu
|
$5.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,498 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,843 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $2,642 | - |
$2,642
-
kWh
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $655 | - |
$655
18,464
kWh
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,521 | $7,698 |
$2,521
21,981
kWh
|
|
04 | 2.7492: Use proper thickness of insulation on building envelope | $1,336 | $82,000 |
$1,336
17,585
kWh
|
|
05 | 2.3191: Use demand controller or load shedder | $4,344 | $250 |
$4,344
-
kWh
|
|
TOTAL RECOMMENDED | $11,498 | $89,948 |
$11,498
58,030
kWh
|
||
TOTAL IMPLEMENTED | $10,843 | $89,948 |
$10,843
39,566
kWh
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs