| Assessment Year | 1996 |
|---|---|
| Principal Product | Refurbished jet engine parts |
| NAICS |
n/a
|
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
65,000
ft2
|
| Annual Production | 77,000
pieces
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $133,555 | 5,401,231 |
kWh
|
$0.025 |
| Electricity Demand | $271,210 | 13,496 |
kW-mo/yr
|
$20.10 |
| Electricity Fees | $241 | - |
|
- |
| Natural Gas | $19,246 | 3,710 |
MMBtu
|
$5.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $78,871 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,152 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $58,784 | $300,000 |
$43,807
1,033,412
kWh
|
$21,045
-
kW-mo/yr
|
$(-6,068.0)
-
MMBtu
|
- | - | - | |
| 02 | 2.7313: Recycle air for heating, ventilation and air conditioning | $2,235 | $4,100 |
$2,235
193,142
kWh
|
- | - | - | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,133 | $1,460 |
$1,133
40,739
kWh
|
- | - | - | - | - | |
| 04 | 2.5125: Size air handling grills/ duct/s coils to minimize air resistance | $935 | $2,000 |
$935
33,411
kWh
|
- | - | - | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $213 | $400 |
$179
2,345
kWh
|
$34
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 3.4114: Replace city water with recycled water via cooling tower | $11,121 | $2,000 | - | - | - |
$11,121
-
Tgal
|
- | - | |
| 07 | 3.6123: Burn wood by-products for heat | $2,800 | $1,500 | - | - | - | - |
$2,800
-
gal
|
- | |
| 08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,650 | - | - | - | - | - | - |
$1,650
-
lb
|
|
| TOTAL RECOMMENDED | $78,871 | $311,460 |
$48,289
1,303,049
kWh
|
$21,079
-
kW-mo/yr
|
$(-6,068.0)
-
MMBtu
|
$11,121
-
Tgal
|
$2,800
-
gal
|
$1,650
-
lb
|
||
| TOTAL IMPLEMENTED | $19,152 | $9,460 |
$3,547
236,226
kWh
|
$34
-
kW-mo/yr
|
- |
$11,121
-
Tgal
|
$2,800
-
gal
|
$1,650
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs