ITAC Assessment: UD0410
ITAC logo
ITAC Assessment: UD0410
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Labels
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 274
Plant Area 200,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $423,601 8,862,837
kWh
Natural Gas $303,272 91,761
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,148 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,618

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3212: Optimize plant power factor $2,250 $2,250 $2,250
-
kWh
02 2.3191: Use demand controller or load shedder - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,000 $12,000 $12,000
195,487
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,156 $5,156 $5,156
108,734
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $22,462 $22,462 $22,462
201,348
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,630 $2,630 $2,630
22,567
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,650 $4,650 $4,650
49,238
kWh
TOTAL RECOMMENDED $49,148 $49,148 $49,148
577,374
kWh
TOTAL IMPLEMENTED $39,618 $39,618 $39,618
505,569
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs