ITAC Assessment: AS0162
ITAC logo
ITAC Assessment: AS0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Chocolate Candy
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 35,000
ft2
Annual Production 670,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,613 459,555
kWh
Natural Gas $5,178 746
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,838 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,038

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $797 $690 $797
8,206
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,748 $2,943 $2,748
33,118
kWh
-
03 2.4133: Use most efficient type of electric motors $734 $1,386 $734
5,569
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $159 - $159
1,465
kWh
-
05 2.2622: Replace existing chiller with high efficiency model $4,099 $13,500 $4,099
36,342
kWh
-
06 2.2414: Use waste heat from hot flue gases to preheat $156 $500 - $156
-
MMBtu
07 2.2511: Insulate bare equipment $145 $173 $39
586
kWh
$106
-
MMBtu
TOTAL RECOMMENDED $8,838 $19,192 $8,576
85,286
kWh
$262
-
MMBtu
TOTAL IMPLEMENTED $1,038 $1,559 $932
7,620
kWh
$106
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs